Home Products Finish

C07 two component epoxy anti-corrosion topcoat

Product Description
Composed of epoxy resin, sun resistant pigments and fillers, dispersants, and curing agents, it is packaged in two components: A and B. The paint film is tough and has excellent adhesion, flexibility, wear resistance, and impact resistance; Has excellent alkali resistance, good water resistance, oil resistance, and chemical resistance; The weather resistance is slightly poor, and after prolonged exposure to sunlight, the surface will undergo powdering.

Design purpose
Used as a topcoat for heavy-duty anti-corrosion systems of steel structures and structures.

Physical parameters
Color: White Pearl White Orange Iron Red Sky Phthalene Blue Blue Wide Leaf Green Gray Black Candlelight Blue
Gloss: Shiny
Theoretical coating rate: 230g/㎡, 5.22 ㎡/L (based on 100 μ M dry film meter, excluding losses)
Specific gravity: approximately 1.20
Drying time: 23 ± 2 ℃: surface drying ≤ 4 hours, solid drying ≤ 24 hours
Complete curing: 23 ± 2 ℃: 7d
Flash point: 27 ℃
Storage period: 12 months

Construction instructions
Mixing ratio: Component A (paint): Component B (curing agent)=20:4
Maturation time: 23 ± 2 ℃: 0.5-1h
Pot life: 23 ± 2 ℃: 8h
Construction method: high-pressure airless spraying, air spraying, manual brushing, roller coating
Diluent: X-7 epoxy coating diluent

 

 

 High pressure airless spraying

有气喷涂

 Manual brushing and roller coating

 Maximum dilution amount

5%

10%

3%

orifice

0.4-0.5mm

2.0-2.5mm

-

 Maximum dilution amount

15-20MPa

0.3-0.5MPa

-

 

Tool cleaning X-7 epoxy coating thinner
Paint film thickness Wet film thickness 190 μ m. Dry film thickness 100 μ M

Painting interval


 Substrate temperature

5℃

20℃

30℃

shortest

48h

24h

12h

longest

14d

7d

5d

 

Surface treatment
If the front paint surface has been contaminated, all oil and debris should be removed;
If the maximum recoating interval of the previous coat is exceeded, the paint surface should be roughened before painting.

Construction conditions
The substrate temperature must be at least 3 ℃ higher than the dew point temperature, and the relative humidity must be less than 85%;
When the substrate temperature is below 5 ℃, the reaction between epoxy and curing agent stops and construction cannot proceed.
Pre coating: CO8-70 two component epoxy zinc rich primer, CO8-8 two component epoxy mica iron intermediate paint.
Packaging specifications: 20 kilograms in a 20 liter container for component A, and 4 kilograms in a 5 liter container for component B.

Precautions
After the application of this coating, it should wait for the paint film to fully cure before being put into use;
If the maximum recoating interval is exceeded, the previous paint film should be polished rough before painting to ensure interlayer adhesion.

security
Avoid long-term inhalation of solvent vapors or paint mist, and do not come into contact with skin or eyes. When working in narrow or poorly ventilated areas, strong ventilation must be provided and protective equipment should be worn during construction.


Notes
The above dry and wet film thickness refers to the indicators during high-pressure airless spraying;
The data related to this manual was obtained in the laboratory, and may vary slightly during actual use due to changes in environmental conditions. If there are any changes to the above data, the latest manual of our company shall prevail without prior notice.

Jiangyin Kanong Chemical Co., Ltd.
18961633675 18951585151
3423610733@qq.com
www.kanongchem.com
Hengshanqiao Town, Wujin District, Changzhou