Home Products Finish

C071 Two component epoxy thick build anti-corrosion topcoat

Product Description
This coating is a high solid thick paste coating composed of epoxy resin as the base material and amine adduct as the curing agent. The paint film has excellent rust prevention and corrosion resistance, excellent physical and mechanical properties, wear resistance, collision resistance, seawater resistance, salt spray resistance, and water penetration resistance.

Design purpose
Used for corrosion protection of ship hulls, ballast tanks, crude oil tanks, fuel tanks, and sewage tanks, as well as for corrosion protection of steel or concrete.

Physical parameters
Color: Silver white, iron red, gray
Gloss: Semi gloss
Theoretical coating rate: 420g/㎡, 3.45 ㎡/L (based on 200 μ M dry film meter)
Specific gravity: approximately 1.40
Drying time: 23 ± 2 ℃: surface drying ≤ 4 hours, solid drying ≤ 24 hours
Complete curing: 23 ± 2 ℃: 7 days
Flash point: 35 ℃
Storage period: 12 months

Construction instructions
Mixing ratio: Component A (paint): Component B (curing agent)=5:1
Maturation time: 23 ± 2 ℃: 20 minutes
Pot life: 23 ± 2 ℃: 4 hours
Construction method: high-pressure airless spraying, manual brushing, roller coating
Diluent: X-7 epoxy coating diluent
Maximum dilution:<5%
Spray hole: 0.46-0.53mm
Ejection pressure: 250Kg/cm ² (Spraying materials are for reference only and can be adjusted when practical)
Tool cleaning: X-7 epoxy coating thinner
Film thickness: Wet film: 290 μ m. Dry film: 200 μ M
Painting interval

 Substrate temperature

10℃

20℃

30℃

 shortest

48h

24h

12h

 longest

14d

10d

5d

 surface treatment
New steel has been shot blasted or sandblasted to meet the Swedish rust removal standard Sa2.5. If temporary protection is required, appropriate workshop primer can be applied. Before final coating, damaged workshop primer and dirt should be thoroughly removed.

Construction conditions
Only use this product under temperature conditions above 10 ℃ where construction and curing can proceed normally. The temperature of the construction surface and the paint itself should also be above this limit. To avoid condensation of water vapor, construction can only be carried out on dry and clean surfaces with a temperature 3 ℃ higher than the dew point. Construction in narrow spaces and during the drying period should be heavily ventilated.
Pre coating: Can be directly applied to steel surfaces with rust removal quality reaching Sa2.5 level, and 1-2 coats of this coating can be applied according to usage requirements.
Maintenance period (23 ± 2 ℃): It can be put into use for more than 14 days.
Packaging specifications: 20 kilograms in an 18 liter container for component A, and 4 kilograms in a 5 liter container for component B.
Note: The coating thickness can be adjusted as needed, but this will correspondingly change the coating rate and affect the drying time.

matters needing attention
The surface of the coating must be rust, oil, dust, and other attachments removed.
If the application time of the previous coating is too long, the subsequent coating should be roughened with water sandpaper to remove surface dust and dirt before painting to ensure interlayer adhesion.
All construction tools should be clean and dry, and the paint should not be mixed with water or other impurities. The paint is ready for use and must be used up within 4 hours.
Before the paint film is completely dried and cured, protective measures should be taken to avoid being washed and trampled by rainwater or other liquids. Store the coating in a cool, ventilated and dry place, away from heat sources, away from direct sunlight, and isolated from flames.

security
Please pay attention to the safety precautions on the packaging label. In addition, safety regulations stipulated by relevant national or local governments should also be followed. Avoid long-term inhalation of solvent vapors or paint mist, and do not come into contact with skin or eyes. When working in narrow or poorly ventilated areas, strong ventilation must be provided, and even if the ventilation conditions are good, protective equipment should be worn.

Notes
The data related to this manual was obtained in the laboratory, and the actual measured data may vary slightly due to changes in environmental conditions and construction conditions during use. If there are any changes to the above data, the latest manual of our company shall prevail without prior notice.

Jiangyin Kanong Chemical Co., Ltd.
18961633675 18951585151
3423610733@qq.com
www.kanongchem.com
Hengshanqiao Town, Wujin District, Changzhou