C08-14 Two component inorganic zinc silicate workshop primer

Product Description
It is prepared by partially hydrolyzing alkyl silicate ester solution with ultrafine zinc powder, coloring pigments, various additives, solvents, etc. The packaging is divided into two components: A and B, which can withstand long-term wind erosion, have good cutting performance, excellent weldability, excellent impact resistance, and have cathodic protection effect.

Design purpose
Suitable as a maintenance primer for steel after shot blasting or sandblasting, with a maintenance period of up to 7-10 months.

Physical parameters
Color: gray, green
Gloss: Matte
Theoretical coating rate: 85g/㎡, 18.0 ㎡/L (based on 15 μ M dry film meter, excluding losses)
Specific gravity: approximately 1.53
Drying time: 23 ± 2 ℃: surface drying ≤ 5min, solid drying ≤ 1h
Complete curing: 23 ± 2 ℃: 3d
Flash point: 18 ℃
Storage period: 12 months for component A and 6 months for component B

Construction instructions
Mixing ratio: Component A (paint): Component B (curing agent)=30:7.5
Maturation time: 23 ± 2 ℃: 0.5h
Pot life: 23 ± 2 ℃: 8h
Construction method: high-pressure airless spraying, air spraying, manual brushing, roller coating
Diluent: X-12 inorganic zinc coating diluent

 

 High pressure airless spraying

 Aerated spraying

 Manual brushing and roller coating

 Maximum dilution amount

30%

30%

5%

orifice

0.4-0.5mm

2.0-2.5mm

-

 Ejection pressure

15-20MPa

0.3-0.6MPa

-

 

Tool cleaning X-12 inorganic zinc coating diluent
Paint film thickness Wet film: 55 μ m. Dry film: 15 μ M

Painting interval


 Substrate temperature

5℃

20℃

30℃

shortest

24h

8h

4h

longest

unlimited

 surface treatment
The steel surface needs to be treated by shot blasting or sandblasting methods, and it is required to meet the Swedish rust removal standard Sa2.5 level, or manual rust removal to reach St3 level, with a roughness of 40-70 microns.
Construction conditions: The temperature of the substrate must be 3 ℃ above the dew point, and the relative humidity must be less than 50%.
Rear supporting coatings: CO7 two component epoxy anti-corrosion topcoat, C252 two component epoxy coal asphalt anti-corrosion topcoat, C18 chlorinated rubber anti-corrosion topcoat, C22 alkyd enamel (weather resistance), C041 two component polyurethane enamel, and C172 high chlorinated polyethylene anti-corrosion topcoat.
Packaging specifications: 30 kilograms in a 20 liter container for component A, and 7.5 kilograms in a 10 liter container for component B.
Note: After using the remaining component B, it should be sealed and stored to prevent failure.

matters needing attention
Due to the high content of zinc powder, it is recommended to use mechanical stirring to stir component A evenly before adding component B and stirring evenly;
When the substrate temperature is ≥ 30 ℃, but not exceeding 60 ℃, in order to avoid dry spraying, diluent must be added to adjust until no dry spraying occurs;
Before applying the next coat of paint, the zinc salt on the surface must be thoroughly removed, otherwise it will affect the interlayer adhesion of the paint film.

security
Avoid long-term inhalation of solvent vapors or paint mist. Skin and eyes should not come into contact with this product. When working in narrow or non ventilated areas, strong ventilation must be provided, and protective equipment should be worn during construction.

Notes
The above dry and wet film thickness refers to the indicators during high-pressure airless spraying;
The data related to this manual was obtained in the laboratory, and the actual product may differ slightly from it;
If there are any changes to the above data, the latest manual of our company shall prevail without prior notice.