Home Products Finish

C128-1 two component weather resistant fluorocarbon anti-corrosion topcoat

Product Description
This paint is based on advanced fluorocarbon resin as the base material, combined with a two-component coating composed of imported titanium dioxide, additives, solvents, etc. The paint film has excellent physical and mechanical properties, excellent anti-corrosion, moisture resistance, salt spray resistance, light retention, color retention, and excellent weather resistance.

Design purpose
Used as a weather resistant and anti-corrosion topcoat for various steel structures such as ships, bridges, derricks, petrochemical pipelines, storage tanks, large steel structures, port machinery, power communication, etc.

Physical parameters
Color: Various colors
Gloss: matte, semi gloss, high gloss
Theoretical coating rate: 240g/㎡ (at 80 μ M dry film meter)
Specific gravity: approximately 1.26-1.37
Drying time: 23 ± 2 ℃: surface drying ≤ 2 hours, actual drying ≤ 24 hours
Complete curing: 23 ± 2 ℃: 7 days
Flash point: 27 ℃
Storage period: 6 months

Construction instructions
Mixing ratio: Component A: Component B=20:5
Maturation time: 23 ± 2 ℃: 20 minutes
Applicable period: 23 ± 2 ℃: 8 hours
Construction method: high-pressure airless spraying, air spraying
Diluent: X-20 fluorocarbon coating diluent
Maximum dilution:<5%
Spray hole: 0.018 ″ -0.021 ″
Ejection pressure: 250Kg/cm ² (Spraying materials are for reference only and may be adjusted when practical)
Tool cleaning: X-20 fluorocarbon coating thinner
Film thickness: Wet film: 190 μ m. Dry film: 80 μ M
Painting interval: 23 ± 2 ℃: minimum 2 hours, maximum 48 hours.

surface treatment
If the previous paint surface has been contaminated, appropriate methods should be used to remove grease and dust, or this paint thinner can be used to scrub.
Construction conditions: The temperature is 0 ℃ -35 ℃, the relative humidity is ≤ 85%, and the surface temperature of the coating should be above the dew point temperature by 3 ℃. Construction cannot be carried out under conditions of rain, fog, snow, and large dust.
Front matching paint: C08-12 two-component inorganic zinc rich primer CO8-70 two-component epoxy zinc rich primer C08-8 two-component epoxy mica iron intermediate paint
Suggested number of coats: two bottoms and two surfaces, with a dry film thickness controlled at 160 μ Above m.
Maintenance period: 23 ± 2 ℃: over 7 days
Packaging specifications: 20 kilograms in a 20 liter container for component A, and 5 kilograms in a 5 liter container for component B.
Note: The coating thickness can be adjusted as needed, but this will correspondingly change the coating rate and affect the drying time.

matters needing attention
1. If the application time of the previous coating is too long, the subsequent coating should be roughened with water sandpaper to remove surface dust and dirt before painting to ensure interlayer adhesion.
2. The tools used for construction should be clean and dry, and the paint should not be mixed with water or other impurities. The paint is ready for use and must be used up within 8 hours.
3. Before the paint film is completely dried and cured, protective measures should be taken to avoid being washed and trampled by rainwater and other liquids.
4. Store the coating in a cool, ventilated and dry place, away from heat sources, avoiding direct sunlight, and isolating sparks.

security
Please pay attention to the safety precautions on the packaging label. In addition, safety regulations stipulated by relevant national or local governments should also be followed. Avoid long-term inhalation of solvent vapors or paint mist, and do not come into contact with skin or eyes. When working in narrow or poorly ventilated areas, strong ventilation must be provided, and even if the ventilation conditions are good, protective equipment should be worn.

Notes
The data related to this manual was obtained in the laboratory, and may vary slightly during actual use due to changes in environmental conditions;
If there are any changes to the above data, the latest manual of our company shall prevail without prior notice.
Jiangyin Kanong Chemical Co., Ltd.
18961633675 18951585151
3423610733@qq.com
www.kanongchem.com
Hengshanqiao Town, Wujin District, Changzhou