Home Products Finish

C12 two component weather resistant acrylic polyurethane topcoat

Product Description
The paint is based on hydroxyl acrylic resin as the base material and HDI diurea as the second component. The paint film has good physical and mechanical properties, excellent anti-corrosion performance, moisture and heat resistance, salt spray resistance, outstanding light retention, color retention, and weather resistance.

Design purpose
Used as anti-corrosion topcoat for ships, bridges, and steel structures.

Physical parameters
Color: Various colors
Gloss: Shiny
Theoretical coating rate: 240g/㎡ (at 75 μ M dry film meter)
Specific gravity: approximately 1.26-1.37
Drying time: 23 ± 2 ℃: surface drying ≤ 2 hours, solid drying ≤ 24 hours
Complete curing: 23 ± 2 ℃: 7 days
Flash point: 27 ℃
Storage period: 12 months

Construction instructions
Mixing ratio: Component A: Component B=20:5
Maturation time: 23 ± 2 ℃: 20 minutes
Applicable period: 23 ± 2 ℃: 6h
Construction method: high-pressure airless spraying, air spraying, manual brushing, roller coating
Diluent: X-13 acrylic polyurethane coating diluent

 

 

 High pressure airless spraying

 Aerated spraying

 Manual brushing and roller coating

 Maximum dilution amount

10%

20%

5%

orifice

0.4-0.5mm

2.0-2.5mm

-

 Ejection pressure

15-20MPa

0.3-0.4MPa

-

 

Tool cleaning: X-13 acrylic polyurethane coating thinner
Film thickness: Wet film: 170 μ m. Dry film: 75 μ M
Painting interval: 23 ± 2 ℃: minimum 2 hours, maximum unlimited

surface treatment
The surface of the steel structure has been shot blasted or sandblasted to meet the Swedish rust removal standard of Class 2.5, or has been derusted by hand and power tools to Class St3.
The surface after rust removal should be cleaned of dust or other impurities before painting.
After rust removal, the steel surface should be immediately coated to prevent secondary rusting.
Construction conditions: The temperature is 0 ℃ -35 ℃, the relative humidity is ≤ 85%, and the surface of the coating should be above the dew point temperature by 3 ℃. Construction cannot be carried out under conditions of rain, fog, snow, and large dust.
Maintenance period: (23 ± 2 ℃) over 7 days
Packaging specifications: 20 kilograms in a 20 liter container for component A, and 5 kilograms in a 5 liter container for component B.

matters needing attention
The tools used for construction should be clean and dry, and the paint should not be mixed with water, banana water, alcohol solvents, gasoline, and other impurities. The paint is ready for use and must be used up within 6 hours.
This coating can be sprayed, brushed, roller coated, and other methods, and different construction methods have different requirements for the viscosity of the coating. To adjust the viscosity of the coating, a special diluent should be used to achieve suitable coating.
Before the paint film is completely dried and cured, protective measures should be taken to avoid being washed and trampled by rainwater and other liquids.
Store the coating in a cool, ventilated and dry place, away from heat sources, away from direct sunlight, and isolated from flames.

security
Please pay attention to the safety precautions on the packaging label. In addition, safety regulations stipulated by relevant national or local governments should also be followed. Avoid long-term inhalation of solvent vapors or paint mist, and do not come into contact with skin or eyes. When working in narrow or poorly ventilated areas, strong ventilation must be provided, and even if the ventilation conditions are good, protective equipment should be worn.

Notes
The data related to this manual was obtained in the laboratory, and may vary slightly during actual use due to changes in environmental conditions;
If there are any changes to the above data, the latest manual of our company shall prevail without prior notice.

Jiangyin Kanong Chemical Co., Ltd.
18961633675 18951585151
3423610733@qq.com
www.kanongchem.com
Hengshanqiao Town, Wujin District, Changzhou